Year:
Size:
Owner:
Architect:
2010
928 sqm
Chinook School Division
BEMP Architects
![IMG-6252.jpg](https://static.wixstatic.com/media/d9743b_e2d1f3c91dba42f9bdc9bc7eaaa9013b~mv2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/d9743b_e2d1f3c91dba42f9bdc9bc7eaaa9013b~mv2.jpg)
![IMG-6263.jpg](https://static.wixstatic.com/media/d9743b_35f096f5dddb45c0867db7455dd42d5e~mv2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/d9743b_35f096f5dddb45c0867db7455dd42d5e~mv2.jpg)
![IMG-6254.jpg](https://static.wixstatic.com/media/d9743b_5ae2c924328d41a2918dc383ba848ded~mv2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/d9743b_5ae2c924328d41a2918dc383ba848ded~mv2.jpg)
![IMG-6252.jpg](https://static.wixstatic.com/media/d9743b_e2d1f3c91dba42f9bdc9bc7eaaa9013b~mv2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/d9743b_e2d1f3c91dba42f9bdc9bc7eaaa9013b~mv2.jpg)
The addition and renovation to the Maple Creek Middle & Secondary School was undertaken in 2010. Significant structural modifications were made to the existing school to accommodate a new stage, music/band room, student lounge, an auxiliary training room and much needed storage for the gymnasium. The renovations included a new elevator installed within the footprint of the existing building and accessible washrooms were added.
The structural modifications consisted of removing columns in the existing pre-engineered rigid frames in the gymnasium to accommodate the new stage. The mid-span frame connection was reinforced to account for the redistribution of internal forces. Other structural upgrades included reinforcing glulam beams that were showing signs of deterioration.